Construction start of our third project for DGS Druckguss Systeme

01.06.2021

Groundbreaking ceremony as starting signal

On 28 April 2021, DGS Druckguss Systeme Liberec s.r.o. started the construction of its new production facility officially with the groundbreaking ceremony in Frýdlant (Czech Republic).

Due to Corona, this celebration took place in a small circle. Mr. Andreas Müller – CEO of DGS Druckguss Systeme AG – thanked MPS Bauplanung in his speech for the reliable cooperation.

Third project with MPS since 2018

DGS Druckguss Systeme from St. Gallen, Switzerland entrusts us with the third project.

  • In 2018, MPS China started with the plant setup of DGS Auto Parts (Rizhao) Co., Ltd. and successfully completed the project in early 2021.
  • In 2019, MPS Germany was contracted for a new production hall in Switzerland, which was opened after only seven months of construction time.
  • This project in the Czech Republic will be completed in April 2022.

Very close to the headquarters in Liberec

DGS Druckguss Systeme s.r.o. focuses on aluminum alloys for body, steering and aggregate components since 1991. In order to increase production capacity, DGS decided for a second production site nearby.

The new production facility with space for several hundred employees, is located just 25 kilometers from the headquarters in Liberec. An administration building has already been designed for the next extension.

MPS thanks for your trust and wishes a successful construction project.

Further information about our client DGS Druckguss Systeme: https://dgs-druckguss.com

Picture source: MPS Bauplanung GmbH & DGS Druckguss Systeme